close window |
| Total EVAs: | 5 | ||
| Total EVA time: | 38h 13m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 09.02.2023 | Fei Junlong | 7h 06m |
Installing the first additional pump block of
the thermal control system and attaching the first external platform to the
Mengtian module of Tiangong Station |
| 2 | 28.02.2023 | Fei Junlong | 7h 50m |
They installed an instrument with 20 plugs
during their 2nd and most secret spacewalk. |
| 3 | 30.03.2023 | Fei Junlong | ~7h 30m |
In the 3rd spacewalk, they connected
inter-module cables. |
| 4 | 15.04.2023 | Fei Junlong | ~7h 30m |
Installing the second additional pump block of
the thermal control system and attaching the second external platform to the
Mengtian module of Tiangong Station |
| 5 | 09.12.2025 | Wu Fei | 8h 17m |
They successfully completed tasks including
inspecting and photographing the windows of the Shenzhou-20 spacecraft's return
capsule, installing the space debris protection device on the space station,
and replacing the multi-layer cover of the temperature control
adapter. |