close window |
| Total EVAs: | 3 | ||
| Total EVA time: | ~20h 52m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 09.12.2025 | Zhang Lu | 8h 17m |
They successfully completed tasks including
inspecting and photographing the windows of the Shenzhou-20 spacecraft's return
capsule, installing the space debris protection device on the space station,
and replacing the multi-layer cover of the temperature control
adapter. |
| 2 | 16.03.2026 | Zhang Lu | 7h 05m |
Installation of space debris protection
devices |
| 3 | 16.04.2026 | Zhang Lu | ~5h 30m |
Installation of space debris protection devices
and the inspection of external equipment and facilities |