close window |
Total EVAs: | 2 | ||
Total EVA time: | 14h 02m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 20.01.2023 | N. Mann | 7h 21m |
The duo completed the installation of a mounting
platform on the 1B power channel that was started during a previous spacewalk
and began installing a mounting platform on the 1A power channel. |
2 | 02.02.2023 | N. Mann | 6h 41m |
Main task was to complete installation of a
mounting platform on the 1A power channel as part of a planned solar array
augmentation on the starboard side of the station's truss. |