close window |
| Total EVAs: | 1 | ||
| Total EVA time: | 7h 02m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 18.03.2026 | J. Meir | 7h 02m |
They prepared the 2A power channel for future
installation of International Space Station Roll-Out Solar Arrays. |