close window

Christopher Leigh Williams

 Total EVAs:  2
 Total EVA time:  14h 22m

No. Date Together with Time Main tasks and notes
 1  18.03.2026  J. Meir  7h 02m
They prepared the 2A power channel for future installation of International Space Station Roll-Out Solar Arrays.
 2  3006.2026  J. Meir  7h 20m
They replaced a wrist joint on the orbital complex's Canadarm2 robotic arm that malfunctioned.