Total EVAs: | 6 | ||
Total EVA time: | 43h 30m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 26.10.2007 | S. Parazynski | 6h 14m |
Retrieve S-band Antenna Support Assembly, detach
Node 2 ("Harmony") heater cables, disconnect Z1/P6 truss fluid lines, install
shrouds on P6 radiator and Sequential Shunt Unit, move and attach Node 2 to
Node 1 left-hand docking port with Station robotic arm, pressurise area between
Node 1 and Node 2 hatches, open Node 1 hatch |
2 | 30.10.2007 | S. Parazynski | 7h 08m |
The astronauts bolt P6 truss to P5 truss,
attached P5 to P6 cabling, removed P6 radiator restraint and cover on
Sequential Shunt unit and deploy radiator. |
3 | 03.11.2007 | S. Parazynski | 7h 19m |
Attaching cufflink-like clips across the 15-foot
width of the torn P6-4B solar array blanket to provide the strength needed to
permit its full extension. This dramatic repair job was carried out successful.
|
4 | 07.08.2010 | T. Dyson | 8h 03m |
They started disconnecting umbilicals from the
broken space station coolant pump. However, difficulty unplugging one of the
ammonia lines consumed a couple of hours and a leak seen from that connector
once it finally cooperated prevented the astronauts from progressing any
further in their work. |
5 | 11.08.2010 | T. Dyson | 7h 26m |
Removing the old pump and stowing it on the
Mobile Base System on the station's truss while preparing the replacement pump
for its removal from a stowage platform adjacent to the Quest airlock and its
installation on the truss during a third spacewalk. |
6 | 16.08.2010 | T. Dyson | 7h 20m |
Installation of a spare ammonia pump module on
the S1 Truss. |