| Total EVAs: | 5 | ||
| Total EVA time: | 33h 30m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 06.08.2026 | J. Meir | 6h 27m |
They installed hardware that will modify the
station's 3B power channel and prepare it for the future installation of an
International Space Station Roll-Out Solar Array (IROSA). |
| 2 | 18.08.2026 | S. Adenot | 6h 23m |
They failed to replace a Space-to-Ground antenna
on the orbital complex. |
| 3 | 25.08.2026 | S. Adenot | 6h 30m |
They finished replacing the Space-to-Ground
antenna on the International Space Station |
| 4 | 29.10.2026 | J. Kutryk | 7h 11m |
They installed and deployed an International
Space Station Roll-Out Solar Array (IROSA) on the 2A electrical power channel.
|
| 5 | 05.11.2026 | J. Kutryk | 6h 59m |
Anil Menon and Joshua Kutryk installed and
deployed the eighth and final IROSA on the 3B channel of the space station,
completing the power augmentation upgrades. |