close window

Leroy Chiao

 Total EVAs:  6
 Total EVA time:  36h 19m

No. Date Together with Time Main tasks and notes
 1  15.01.1996  D. Barry  6h 09m
Evaluation of EVA activity tools (EDFT-03)
 2  17.01.1996  W. Scott  6h 54m
Evaluation of EVA activity tools (EDFT-03)
 3  15.10.2000  W. McArthur  6h 28m
The S-band Antenna Support Assembly was relocated on the Z1 Truss. The port Extravehicular Tool Storage Devices were released and transferred from the Spacelab Logistics Pallet to the Z1 Truss. The Space-to-Ground Antenna dish was installed onto the boom and the boom was deployed.
 4  17.10.2000  W. McArthur  6h 48m
Two DC-to-DC Converter Unit-Heat Pipes were installed on Z1. The Z1 keel pin assembly was then relocated to another location on Z1. The starboard Extravehicular Tool Storage Device was released and transferred from the Spacelab Logistics Pallet to the Z1 Truss.
 5  26.01.2005  S. Sharipov  5h 30m
Installing a work platform on the hull of the command module, to mount the European commercial experiment Rokviss, to relocate the Japanese space exposure experiment package and to install a Russian biological experiment
 6  28.03.2005  S. Sharipov  4h 30m
Installing three communications antennas for the ATV and a GPS antenna; Sharipov manually deployed a Russian experiment, tossing a small science satellite called "Nanosatellite" into orbit